top of page
NEWS
News & Articles


Ambulance Diagnostic Centre, West Middlesex Hospital
RDBL offered an enabling works package and provided substantial cost saving for a Tier 1 client by designing a piling platform that was stepped which removed the previous requirement for Sheet Piling (saving in the region of £70-80k) along the boundary without applying any temporary loading on the existing live services and hoarding.


Trafalgar Wharf, Cosham, Hampshire
Case Study for Holly Lodge Centre for The Royal Parks. Principal Contractor role direct for the client in a design and build capacity, carrying out underpinning, structural repairs and reinstatements of external areas.


Holly Lodge Centre, Richmond Park, London
Case Study for Holly Lodge Centre for The Royal Parks. Principal Contractor role direct for the client in a design and build capacity, carrying out underpinning, structural repairs and reinstatements of external areas.


Kew Riverside London
Case Study for Kew Riverside London for Elysian Residences. RDBL mobilised on day 1 to be informed that badgers were potentially nesting nearby and therefore the working area was reduced, reducing logistics. RDBL worked quickly to install additional drainage in compliance with the trade effluent licence and a new access haul road.

bottom of page